A primer for new owners and investors
How a solar and storage plant earns, from irradiance to the evening peak
Eight steps, term first, then plain language. The battery is what turns a daytime plant into a dispatchable evening one.
Process flow
Water to wire, in eight steps
- 01
Irradiance
Sunlight: free fuel, measured site by site and modelled hour by hour.
- 02
PV modules
On the ground, on trackers or on floats on a lake, modules turn light into DC power.
- 03
Combiners and inverters
DC is gathered and converted to grid-ready AC at 690 V.
- 04
MV transformers
Stepped up to medium voltage and collected on one bus, the plant's internal backbone.
- 05
Battery storage
The battery charges by day and returns full power for four hours after sunset.
- 06
Generator step-up
One substation raises the voltage; one line carries the plant to the grid.
- 07
Point of interconnection
Where the plant meets the grid. Metered here, and paid under the PPA.
- 08
Load
Homes and industry: the evening peak served from the plant.
A day in the life
Day: PV to grid, surplus to the battery. Evening: the battery to the grid.
Demand peaks after sunset, the hours a grid pays most for. A four-hour battery moves midday energy into those hours, and can also hold frequency and voltage, reduce curtailment and help restart the grid.
How the plant connects
One bus, one step-up, one line to the grid
PV blocks and the battery feed one medium-voltage collection bus, one generator step-up transformer and one gen-tie to the point of interconnection, where the plant meets the grid and is metered.
The final voltage levels follow the utility's standard and the transformer offering. Sizes on any concept diagram are indicative until the studies are done.
Where to put the panels
Floating, ground-mount or agrivoltaic
Where land is scarce and farmed, water and dual use are reasonable choices. Each brings its own cost and risk, and the choice should come from a study.
Floating PV
Uses water instead of farmland, and the water cools the modules, which adds yield. Floats, mooring and anchoring add cost and risk that a lake survey must bound.
Ground-mount
The established utility-scale form: fixed tilt or trackers, the lowest cost per watt where land, soil and access allow.
Agrivoltaics
Crops or grazing under elevated panels. Row pitch and clearance height trade a little yield for land that stays in production.
The owner's view
A 25-year contract on a 35-year plant
The tariff is won in year 0 and kept in years 8 to 25. We price every component that will wear out before financing closes, so the financial model, the maintenance contract and the warranties tell one story.
- Yr 0 to 2
Build and commission
Capacity and performance tests set the baseline.
- Yr 1 to 10
Warranty window
Module, inverter, float and battery warranties enforced by owner-side audits.
- Yr 8 to 12
BESS augmentation
Cells added or replaced to hold the usable capacity.
- Yr 12 to 15
Inverter and PCS replacement
Planned and priced in year 0, not a surprise.
- Yr 15 to 25
Second battery life
Augmentation or full replacement; tariff and dispatch re-optimised.
- Yr 25 to 35
Beyond the PPA
Modules and floats still working: extension, merchant sale or repowering.
Picture glossary
The terms, explained before they are decided
The words that appear in a notice, a PPA or a design review, in plain language.
- FPVFloating photovoltaic
- Modules on HDPE floats, moored to the lake bed and the shore.
- APVAgrivoltaics
- Dual-use solar over crops or grazing.
- BESSBattery energy storage system
- Stores energy by day and returns it when the grid needs it.
- PCS and BMSPower conversion, battery management
- The battery's inverter, and the system that keeps its cells healthy and safe.
- GSUGenerator step-up transformer
- Raises the plant's voltage to transmission level.
- POIPoint of interconnection
- Where the plant meets the grid and is metered.
- PPAPower purchase agreement
- The contract under which the utility buys the plant's energy.
- EPCEngineering, procurement, construction
- The contractor that builds the plant for a fixed scope and price.
- OEOwner's engineer
- The engineer who works for the owner, not the builder.
- IFR to IFCIssued for review to issued for construction
- From first drawings to the drawings a plant is built from.
- FAT and SATFactory and site acceptance tests
- Equipment proven at the factory, then again on site.
- P50 and P90Expected and bank-case yield
- The energy a plant beats half the time, and nine years in ten.
- PVsyst 8760Hourly energy model
- A model of every hour of the year: 8,760 of them.
- CurtailmentTurn-down by the grid
- The grid instructing the plant to reduce output.
- Deemed energyPaid but not taken
- Energy the plant could have delivered, paid under the PPA when the grid could not take it.
- SCADA and PPCControl and monitoring
- The layer that runs the plant and talks to the grid operator.
- ESIAEnvironmental and social impact assessment
- The study of the plant's effect on land, water and communities.
- CODCommercial operation date
- The day the plant starts earning under the PPA.